Based on the status and characteristics of Clean Development Mechanism (CDM) renewable energy project and the mode of cyclic economy, aimed at achieving the maximum capacity of carbon sinks in the system, Lvjin Jiayuan—New Countryside Distripark CDM project in Wuchuan County was taken as an example for developing an interval linear programming (ILP) model to optimize the crops planting scheme and cows breeding scheme by using interval optimal method. The case showed that the optimized crops planting scheme and cows breeding scheme obtained from the optimal model was reasonable with relatively preferable overall performance. In the context of meeting economic benefits and fertilizer, electricity demand, [231 287.8, 273 312.7] t of CO2 could be absorbed and fixed, which had increased by [12.94, 33.46]% compared with the feasibility scheme of case project and provided technical support for making the decision in CDM project.